Estudio geotécnico in Crevillent
Do you need a Geotechnical study?
Find the best price and service in Crevillent. Get a free quote.
More than 1000 geotechnical studies carried out
Get personalized attention
We can contact you via WhatsApp, phone, or email, whichever you prefer.
Comprehensive Geotechnical Studies
Comprehensive Geotechnical Studies
We combine field analysis and laboratory testing to provide accurate technical reports and foundation solutions.
Expert professional
Expert professional
Technicians with more than 15 years of experience in the industry. We are specialists in access to difficult locations such as sites with level changes, basements, etc.
Accredited
Accredited
Geotechnical calculations comply with the rules established by Eurocode 7, UNE-EN ISO 22476-4:2016.
Best price
Best price
Very competitive prices. The best prices for geotechnical studies in Spain. Request a quote and check it.
Speed and quality
Speed and quality
Within 7 to 10 days you will receive a signed report from a geologist. It is mandatory in order to carry out new construction or refurbishment works that involve modifications to the structure.
Work areas
We provide a Geotechnical study service in all localities of Crevillent.
This includes the following geographical areas: Alicante, Castellón, Valencia, Comunidad Valenciana and surrounding areas.
We travel to your home in Crevillent when it suits you, agreeing a day and time.
Types of ground in Crevillent
In Crevillent, the subsurface is dominated by fine sands and silts, which represent the largest proportion of the materials present. These soils generally provide moderate bearing capacity, so it is essential to carry out a detailed analysis to define the most appropriate foundation, since the occasional presence of sandstones, conglomerates and flysch is usually rare. In addition, the low permeability of these formations affects natural drainage and can influence both differential settlement and the design of the foundation drainage systems.
Seismicity in the municipality is moderate, with 23 events over 30 years and a maximum magnitude of 4.1, which means attention is required during structural sizing, although this is not an elevated level of risk. Given the possibility of karst presence, it is necessary to verify this condition prior to any foundation, as it could affect the stability of the supporting ground. Finally, since the substrate is non-clayey, the risk of ground expansiveness is ruled out, with the most important geotechnical factor being the possible existence of karst cavities and the adequate characterisation of the bearing capacity of the sandy and silty soils.
Fine sands and silts
88.88%
Construction risks in Crevillent
Approximate estimates. They do not replace the geotechnical study.
| Soil type | Expansivity | Settlements | Water table | Seismicity | Minimum foundation |
|---|---|---|---|---|---|
| Fine sands and silts | None | High | High | High | To avoid local punching, the foundation slab is used ext... |
| Sandstones, Conglomerates and Flysch | None | Media | Media | Media | Direct foundation is feasible in most cases. For flysch ... |
Interactive geological map · Crevillent
Mapping: IGME GEODE 50k · IGME MAGNA 50 · ICGC (Catalonia)
Geological Viewer
IGME · ICGC- Click on the map to see the geology at the point.
- Use the layer buttons to switch between geological views (GEODE, MAGNA, Lithology, Hydrogeology).
- Adjust the opacity of the geological layer with the control below.
- Press the full-screen button to expand the viewer.
Geological information
Typical stratigraphic profile
Indicative subsurface cross-section in Crevillent · Based on GEODE soil types
Indicative profile based on GEODE soil types and typical CTE thicknesses
Seismic risk in Crevillent
- 1 M 4.1 2001
- 2 M 3.5 2003
- 3 M 3.4 2015
How do we carry out your geotechnical study?
How do we carry out your geotechnical study?
Step
Free quote
Free quote
Request a quotation for your geotechnical study. Completely free and with no obligation.
Step
We arrange a day
We arrange a day
We are looking for a day and time to carry out the field study.
Step
Conducting the geotechnical study
Conducting the geotechnical study
We’re going to move and carry out the study. In an hour or two we’ll have finished.
Step
Report submission
Report submission
Within a week we will send you the signed documents of the geotechnical study by an accredited geologist.
Also available in
Spain’s most populated cities
Useful information about Geotechnical study
In-depth articles
Entities and institutions