Estudio geotécnico in Arenys de Mar
Do you need a Geotechnical study?
Find the best price and service in Arenys de Mar. Get a free quote.
More than 1000 geotechnical studies carried out
Approximate price 750€
We can contact you via WhatsApp, phone, or email, whichever you prefer.
Comprehensive Geotechnical Studies
Comprehensive Geotechnical Studies
We combine field analysis and laboratory testing to provide accurate technical reports and foundation solutions.
Expert professional
Expert professional
Technicians with more than 15 years of experience in the industry. We are specialists in access to difficult locations such as sites with level changes, basements, etc.
Accredited
Accredited
Geotechnical calculations comply with the rules established by Eurocode 7, UNE-EN ISO 22476-4:2016.
Best price
Best price
Very competitive prices. The best prices for geotechnical studies in Spain. Request a quote and check it.
Speed and quality
Speed and quality
Within 7 to 10 days you will receive a signed report from a geologist. It is mandatory in order to carry out new construction or refurbishment works that involve modifications to the structure.
Work areas
We provide Geotechnical study in all towns and localities of Arenys de Mar.
This includes the following geographical areas: Province of Barcelona, Girona Province, Province of Lleida, Province of Tarragona, Cataluña and the surrounding areas.
We travel to your home in Arenys de Mar when it suits you, agreeing a day and time.
Types of ground in Arenys de Mar
In Arenys de Mar, the geotechnical subsoil is dominated by granitic materials, gneisses and other igneous rocks, representing close to 70% of the municipality. These rock types are characterised by providing a high bearing capacity and minimal compressibility, which makes it easier to select solutions for shallow foundations. Areas where fine sands and silts crop out, although less frequent, may require additional assessment of the compactness and the possible risk of differential settlements, depending on the thickness of these layers.
Seismicity in Arenys de Mar is classified as very low, with only five recorded events over 30 years and a maximum magnitude (Mmax) of 3; therefore, the influence of seismic movements on structural design is practically negligible. The non-clayey subsoil rules out any risk of expansivity, and there are also no impacts from karst processes. In conclusion, the main constraint for the geotechnical study in Arenys de Mar is the appropriate characterisation of sectors with silts or sands, since the rock substratum predominates and ensures favourable conditions for foundation design.
Fine sands and silts
30.77%
Construction risks in Arenys de Mar
Approximate estimates. They do not replace the geotechnical study.
| Soil type | Expansivity | Settlements | Water table | Seismicity | Minimum foundation |
|---|---|---|---|---|---|
| Granite, gneiss and igneous rocks | None | Downward | Downward | Downward | Direct foundation using isolated spread footings bearing... |
| Fine sands and silts | None | High | High | High | To avoid local punching, the foundation slab is used ext... |
Interactive geological map · Arenys de Mar
Mapping: IGME GEODE 50k · IGME MAGNA 50 · ICGC (Catalonia)
Geological Viewer
IGME · ICGC- Click on the map to see the geology at the point.
- Use the layer buttons to switch between geological views (GEODE, MAGNA, Lithology, Hydrogeology).
- Adjust the opacity of the geological layer with the control below.
- Press the full-screen button to expand the viewer.
Geological information
Typical stratigraphic profile
Indicative subsurface cross-section in Arenys de Mar · Based on GEODE soil types
Indicative profile based on GEODE soil types and typical CTE thicknesses
Seismic risk in Arenys de Mar
- 1 M 3 2023
- 2 M 2.4 2004
- 3 M 1.8 2004
How do we carry out your geotechnical study?
How do we carry out your geotechnical study?
Step
Free quote
Free quote
Request a quotation for your geotechnical study. Completely free and with no obligation.
Step
We arrange a day
We arrange a day
We are looking for a day and time to carry out the field study.
Step
Conducting the geotechnical study
Conducting the geotechnical study
We’re going to move and carry out the study. In an hour or two we’ll have finished.
Step
Report submission
Report submission
Within a week we will send you the signed documents of the geotechnical study by an accredited geologist.
Also available in
Spain’s most populated cities
Useful information about Geotechnical study
In-depth articles
Entities and institutions